Abstract
PreviewISO/TR 17177:2015 provides guidance for installations, equipment and operation at the ship to terminal and ship to ship interface for hybrid floating and fixed LNG terminals that might not comply with the description of "Conventional LNG Terminal" included in ISO 28460.
ISO/TR 17177:2015 is intended to be read in conjunction with ISO 28460 to ensure the safe and efficient LNG transfer operation at these marine facilities.
ISO/TR 17177:2015 also addresses high pressure natural gas (HPNG) at the transfer interface at facilities where liquefaction or regasification is undertaken, but does not describe requirements for the process plant generally forming part of the terminal facility.
These guidelines are based around facilities that are currently in operation or under development.
-
Status: PublishedPublication date: 2015-04
-
Edition: 1Number of pages: 28
-
Technical Committee: ISO/TC 67/SC 9 Production, transport and storage facilities for cryogenic liquefied gases
-
- ICS :
- 75.200 Petroleum products and natural gas handling equipment
Buy this standard
Format | Language | |
---|---|---|
std 1 145 | PDF + ePub | |
std 2 145 | Paper |
- CHF145
Life cycle
Got a question?
Check out our FAQs
Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)
Keep up to date with ISO
Sign up to our newsletter for the latest news, views and product information.